![]() ![]() This phase of the project will also improve safety for walkers, rollers and cyclists by adding new sidewalks and a segment of the multi-use Tacoma to Puyallup Trail.Īlthough this construction will lead to meaningful long-term benefits, it will also have an impact on traffic in the Fife area. The electronically tolled expressway is designed to improve movement of freight and reduce congestion on nearby roads and highways. WSDOT’s SR 167 project to construct a two-mile-long highway connecting I-5 and SR 509 near the Port of Tacoma is underway. Stay alert, follow construction signage, slow down and remain focused on the road to keep themselves and crews safe.Observe the posted 50 mph construction zone speed limit.Continue to drive through the work zone using caution.The orange striping will remain in place throughout the summer until lane lines return to traditional white striping in fall 2023.Īs travelers approach the new orange and white lane lines, they should: Orange lane striping has been added to white lane lines between milepost 138 near Wapato Way and milepost 139 near Porter Way to call attention to work zones related to the State Route 167 Completion Project. ORANGE LANE STRIPING ON I-5 IN FIFE CALLS ATTENTION TO THE WORK ZONE July 5 Single lane closure 54th Ave E from 4th Street to 8th Street in both directions from 8 p.m. June 26 - September 5 Full 24/7 closure of 12th Street from 62nd Ave. June 22 One lane of traffic on SR 99 northbound at milepost 1 will be closed from 9 a.m. Weekdays through June 23 One lane of traffic on SR 99 southbound at milepost 1 will be closed from 5 a.m. Ongoing Expect shoulder closures along I-5 at the Fife bend, both southbound and northbound, from 9 a.m. Through 2026, occasional lane closures and traffic shifts may occur to help advance construction. Drivers wishing to detour to SR 99 should use 8th Street East and 62nd Avenue East. People walking on 54th Avenue East should be aware that sidewalks may be reduced or removed in some areas, and walking detours will be in place. What can travelers through this area expect? ![]() This is one of several traffic shifts that will be put in place over the next three years so that WSDOT can install utilities and eventually build a roundabout and bridge for the future elevated expressway at this location. Both lanes in each direction will remain open. ![]() Crews will remove the center lane and shift two southbound lanes to the east. Starting July 6, 2023, contractor crews working for the Washington State Department of Transportation will shift traffic on 54th Avenue East between 4th Street East and 7th Street East (see map below). SR 167/I-5 TO SR 509 EXPRESSWAY PROJECT CONSTRUCTION UPDATES CURRENT ROAD PROJECTS: CLOSURES, LANE REDUCTIONS AND MORE IN FIFE ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |